Health Score

One health score for your baseline plan.

OPTEAM reads your Primavera baseline and scores its health across upload logic, progress, relationships, float and DCMA checks, rolled into a score you can act on.

Start free trial Talk to an expert
82.7 baseline health scoreDCMA 14-point checks7 issues flagged to fix
82
OF 100
DCMA 14-point
Schedule health
HEALTHY
Logic & relationshipsPass
!Hard constraints2 found
Critical path testPass
Score 82
Inside OPTEAM

See exactly why the score is what it is.

Activity logic, progress, relationships, resources and DCMA — each scored, each with the issues that need action.

app.opteam.ai/projects/overview
OPTEAM schedule health score gauge reading 82.7 with breakdowns for activity logic, progress, relationships, resources and DCMA checks
Logic health · 100% 7 require action
Why it works

A health check your schedule never gets otherwise.

Baseline risk percent

One number for the whole plan, the moment your baseline lands.

DCMA 14-point checks

Industry-standard checks for logic, leads/lags, float and constraints — flagged in plain language.

Drill into the drivers

Each sub-score opens the exact activities and relationships dragging your health down.

How it works

From raw schedule to a score you trust.

Upload your .xer and OPTEAM reads every activity and relationship to calculate the score in seconds.

Upload

OPTEAM reads activities, logic, float and the critical path from your file.

Score

14-point DCMA and OPTEAM checks roll into a 0–100 health score.

Act

See the issues that need action, ranked by impact on your finish date.

Schedule health · live
OVERALL HEALTHGOOD
82.7+1.4 vs last
CRITICAL PATH DRIFTWATCH
+11d31 activities
ISSUES TO FIXACTION
7ranked
The difference

From "looks fine" to proven healthy.

Before OPTEAM
Schedule quality judged by gut feel or a yearly audit.
DCMA checks run manually in a separate tool, if at all.
Problems surface only when the finish date slips.
With OPTEAM
A clear score card the whole team can see.
DCMA + logic checks run on your baseline plan.
Issues flagged early, ranked by impact on the deadline.
By the numbers

Proof, not promises.

Seconds
From upload to a scored baseline
Zero
Manual schedule reviews
Day 1
See plan risks before work starts
Questions

Good to know.

What goes into the health score?
Activity logic and relationships, progress vs baseline, float and constraints, resources and cost, and the DCMA 14-point assessment — each weighted into a single 0–100 score.
Which file formats can I upload?
Primavera P6 (.xer, .xml). OPTEAM parses the full activity network, logic and the critical path.
How often does the score update?
Every time you upload a new progress file or a field update changes an activity, the score recalculates automatically.
Can I see what is hurting the score?
Yes. Each sub-score expands into the exact activities, relationships and constraints driving it, ranked by impact.