AI Engine

AI that reads your schedule like a planner.

OPTEAM understands activities, logic and the critical path the way an experienced planner would — then computes earned value, forecast and risk 24/7, so nothing slips unnoticed.

Start free trial Talk to an expert
Reads .xer24/7 monitoringForecast & risk, live
app.opteam.ai/projects/2199 AI Assistant
CT
Clover Tower 2Master schedule · Saudi Arabia
Live
Why are we forecasting a late finish?

Clover Tower 2 is tracking behind — actual progress is 22.7% vs 32.6% planned, pulling SPI to 0.70. The slip traces to EC1340 Footings on the critical path, so total float is now negative and forecast finish moves to Apr 7, 2027.

SPI
0.70
Total float
−15d
Health
82
Delay analysisPDF · generated
Ask about Clover Tower 2…
Grounded in your data Report attached
Inside OPTEAM

Earned value, critical path and forecast — computed for you.

OPTEAM turns a raw schedule into an executive read: SPI, earned value, days delayed, longest path and total float.

app.opteam.ai/projects/overview
OPTEAM project overview with executive summary showing SPI 0.70, planned and earned value, forecast finish, days delayed and critical path metrics
SPI 0.70 · behind Forecast finish · Apr 2027
Why it works

A planner that never sleeps.

Reads the whole network

Activities, logic, leads/lags and the critical path — parsed in seconds from your file.

Computes what matters

Earned value, SPI/CPI, forecast finish and total float, recalculated on every update.

Watches 24/7

Risks and drift are flagged the moment they appear, not at the next review.

How it works

From file to foresight.

Connect your Primavera P6 file and OPTEAM builds a live model of your project it keeps watching.

Ingest

Upload your .xer — OPTEAM parses the full activity network.

Model

It computes earned value, critical path, forecast and float.

Alert

Drift and risk are surfaced continuously, with the drivers behind them.

AI engine · live read
SCHEDULE PERF (SPI)BEHIND
0.7-32.5M SV
DAYS DELAYEDCRITICAL
15d31 on path
TOTAL FLOATWATCH
-15dover-used
The difference

From static schedule to living model.

Before OPTEAM
Schedules analysed manually, once a reporting cycle.
Earned value stitched together in spreadsheets.
Risks spotted only when someone goes looking.
With OPTEAM
A live model recomputed on every update.
EVM, forecast and float calculated automatically.
Drift and risk flagged 24/7, with the drivers.
By the numbers

Proof, not promises.

24/7
Schedule monitoring
2
File formats read
0.94
Typical SPI surfaced
24/7
Always watching
Questions

Good to know.

What does the AI engine actually do?
It parses your schedule into a live model — activities, logic, critical path — and continuously computes earned value, forecast finish, float and risk so you always have a current read.
Does it change my schedule?
No. OPTEAM reads and analyses your schedule; you stay in control of the source file in Primavera P6.
How current is the analysis?
It recomputes on every new progress upload or field update — there is no waiting for a manual refresh.
Is my schedule data secure?
Your files are processed securely and used only to model and monitor your own projects.